02 Aug Hyatt Place Work Continues – Exterior Finished
The Hyatt Place exterior has been completed. Work continues on the interior on a floor by floor basis. Rooms are framed and electrical is followed by drywall installation. As each floor is completed work moves to the next level with all work being inspected on a daily basis.